PROJECT DETAILS

  • Construction Date: In progress
  • Location: Municipality of Bajina Basta
  • Surface Area: 26,4 ha
  • Client: PE “EPS – a branch of the Drina-Lim HPP”, Bajina Basta
  • Category: Urban plans

ABOUT THIS PROJECT

It is planned to equip the area with the necessary urban furniture (benches, tables, fountains, showers, fishing trails, etc.). In addition to the facility of the information point of the National Park “Tara”, the possibility of setting up a marina for boats with approximately 30-50 berths is planned.

For the needs of pedestrian communication, in addition to the existing footpath, it is planned to create another footpath along the lake shore which enables pedestrian communication from the existing parking lot in the vicinity of the hydroelectric power plant, all the way to the information point of NP „Tara“.